Warning: is_file(): open_basedir restriction in effect. File(/templates/system/css/system.css) is not within the allowed path(s): (/var/www/vhosts/sab-nord.de/:/tmp/) in /var/www/vhosts/sab-nord.de/vigorous-galileo.162-55-29-102.plesk.page/libraries/joomla/filesystem/file.php on line 630

Sidebar

Disposal plant for M77 bomblets

  • Fully automatic plant
  • Conveying system with cross transfer
  • Triple station for disassembling the bomblets
  • Separating station for stabilization strap, separating station for detonator, pressing out the copper cone
  • Working process under security
  • CCTV-surveillance
  • Fully automatic plant
  • Remote maintenance system
  • Plant performance: 1 MLRS-warhead/hour
  • Simultaneous disassembly of 3 bomblets
  • Separate conveying system for transporting the detonators and shells out of the safety area
  • Cycle time: 1 MLRS warhead/hour
  • Connected load: 40 kW
  • Weight: 14 t
  • Mode of operation: 24/7
  • Manufacturer of the drive system: SEW
  • Manufacturer of the control system: Siemens S7